Notice: Undefined variable: images_size_articles_big in /home/jnico/public_html/catalog/controller/newsblog/article.php on line 135Notice: Undefined variable: images_size_articles_big in /home/jnico/public_html/catalog/controller/newsblog/article.php on line 135Warning: imagecreatetruecolor(): Invalid image dimensions in /home/jnico/public_html/system/library/image.php on line 105Warning: imagecolorallocate() expects parameter 1 to be resource, bool given in /home/jnico/public_html/system/library/image.php on line 113Warning: imagefilledrectangle() expects parameter 1 to be resource, bool given in /home/jnico/public_html/system/library/image.php on line 116Warning: imagecopyresampled() expects parameter 1 to be resource, bool given in /home/jnico/public_html/system/library/image.php on line 118Notice: Undefined variable: images_size_articles_small in /home/jnico/public_html/catalog/controller/newsblog/article.php on line 136Notice: Undefined variable: images_size_articles_small in /home/jnico/public_html/catalog/controller/newsblog/article.php on line 136Warning: imagecreatetruecolor(): Invalid image dimensions in /home/jnico/public_html/system/library/image.php on line 105Warning: imagecolorallocate() expects parameter 1 to be resource, bool given in /home/jnico/public_html/system/library/image.php on line 113Warning: imagefilledrectangle() expects parameter 1 to be resource, bool given in /home/jnico/public_html/system/library/image.php on line 116Warning: imagecopyresampled() expects parameter 1 to be resource, bool given in /home/jnico/public_html/system/library/image.php on line 118 Drilling at Kahuna Project by Dunnedin

Drilling at Kahuna Project by Dunnedin

Dunnedin Ventures provides an update on its ongoing 2018 drill program at its 100% owned Kahuna project, Nunavut. The Company has drill-tested five of approximately 40 targets (13%), with potentially diamond-bearing kimberlite intercepted at two targets. Of the five targets drilled, two were high count DIM-in-till targets, both of which yielded significant extensions to the known high-grade diamond-bearing PST and 07KD-24 kimberlite dikes.   

 

Chris Taylor, Dunnedin’s CEO said, “During April drilling, we were able to show that our DIM-based exploration methods work.  We confirmed that high concentrations of priority ranked DIMs correlate directly to new potentially diamond-bearing kimberlite in both areas where tested.  Unusually poor weather only allowed us to test a handful of targets near our camp, and we are eager to drill our main DIM targets as soon as field conditions allow. Many of these are associated with kimberlite pipe-type geophysical signatures and large, high-count DIM trains that appear highly prospective for new diamond discoveries.”

 

The first of the kimberlites drilled during the program is an on-strike extension to 07KD-24, an exceptionally diamond bearing kimberlite dike which historically returned over 305 diamonds including seven commercial-sized diamonds from a 2.2 kg sample.

 

 

 

  • Drilling at Kahuna Project by Dunnedin