Warning: fread(): Length parameter must be greater than 0 in /home/jnico/public_html/system/library/cache/file.php on line 32Warning: fread(): Length parameter must be greater than 0 in /home/jnico/public_html/system/library/cache/file.php on line 32 Argyle Decline Weighs on Rio Tinto Output

Argyle Decline Weighs on Rio Tinto Output

Perth: Rio Tinto’s diamond production fell in the first quarter, as its Argyle mine in Australia yielded a reduced volume and lower grade of ore.

Group output dropped 8% year on year to 4.152 million carats for the three month period, with Argyle’s production down 11% to 3.016 million carats, Rio Tinto reported Thursday. Argyle’s operations shifted underground in 2013, helping extend the life of mine to 2020.

Rio Tinto also owns 60% of the Diavik mine in Canada, where first-quarter production was in line with the previous year at 1.136 million carats. Dominion Diamond Corporation owns the remaining 40% of Diavik.

Rio Tinto maintained its forecast to recover between 19 million and 24 million carats this year, representing an increase from the 17.953 million carats it mined in 2016.

  • Argyle Decline Weighs on Rio Tinto Output
Warning: Unknown: write failed: Disk quota exceeded (122) in Unknown on line 0Warning: Unknown: Failed to write session data (files). Please verify that the current setting of session.save_path is correct (/var/cpanel/php/sessions/ea-php73) in Unknown on line 0