Warning: fread(): Length parameter must be greater than 0 in /home/jnico/public_html/system/library/cache/file.php on line 32Warning: fread(): Length parameter must be greater than 0 in /home/jnico/public_html/system/library/cache/file.php on line 32 Dynacor Produces 6.4 % more in May

Dynacor Produces 6.4 % more in May

Dynacor Gold Mines reports that its May 2018 gold production reached  to 6,902 ounces at its Veta Dorada plant which is similar to the production in the previous month. During the month of May 7,985 dry metric tonnes (DMT) of mineralized material were processed (6.4 % above the forecast of 7,500 DMT).

 

Gold grades of the purchased and processed material were less than anticipated resulting in a lower gold production. During the first five months of 2018 the Veta Dorada plant processed 36,298 dry metric tonnes (DMT) of material compared to 27,095 DMT in the same period last year.

 

This represents an increase of 34% and confirms the efforts underway to increase the processing volume each month. The Corporation is continuing to ramp up production on its way to its annual production guidance of 90-94,000 ounces.

 

  • Dynacor Produces 6.4 % more in May
Warning: Unknown: write failed: Disk quota exceeded (122) in Unknown on line 0Warning: Unknown: Failed to write session data (files). Please verify that the current setting of session.save_path is correct (/var/cpanel/php/sessions/ea-php73) in Unknown on line 0